GRP Pipe Production Factory - CFW LINE | Print |

Machines in the factory can be disposed according to the factory building or special client requirements. Layout drawing shows typical factory arrangement.factory2600

Pos.    Description

1    Tools Cleaning Room
2    Resin Mixing Room
3    Dosing Pump Room
4    Bridge Crane – 10 tons
5    CFW2600 Machine
6    Resin Storage 4 x 50m3
7    Vapours Suction Ventilator
8    Dust Filter
9    Pipe Transport Equipment
10    OGM2600 Offline Grinding Machine
11    SGM2600 Sleeve Grooving Machine
12    SHTM2600 Sleeve Hydrotesting Machine
13    SJM2600 Sleeve Joining Machine
14    PHTM2600/640 Pipe Hydrotesting Machine
15    Laboratory
16    Air Compressor
17    Main Power Panel
18    Main Control Console
19    Diesel Electric Generator
20    Electro Station
21    Fittings Production Area
22    Pipe Testing Area
23    Catalyst Storage Area
24    Accelerator Storage Area

Factory covered area and height required:

  • Width = 36m
  • Length = 78m
  • Height = 7,5 (under crane hook)

Factory outside uncovered area required:

  • Area = 25000 m2

Utilities requirements:

  • Power  Supply = 3 x 400V / 50 Hz
  • Production Line Installed Power =App. 400 kW
  • Max. Compressed Air Consumption = 8 bar - 6 m3/min
  • Emergency Diesel Generator = 240 kW

The complete CFW production factory requires approximately 60 employees for the production in 3 shifts (24h per day). They are divided in the following positions:

  • 1 production manager
  • 4 machine captains on CFW machine
  • 16 machine operators on CFW machine
  • 4 machine operators on the SGM machine
  • 4 machine operators on the SHTM machine
  • 6 machine operators on the PHTM machine
  • 2 machine operators on the SJM machine
  • 1 quality control manager
  • 4 quality control operators
  • 4 mechanical and electrical maintenance workers
  • 4 store keepers
  • 10 workers in the fitting manufacturing shop
 