GRP Pipe Production Factory - CFW LINE |
| Print |
|
|
Machines in the factory can be disposed according to the factory building or special client requirements. Layout drawing shows typical factory arrangement.
Pos. Description
1 Tools Cleaning Room
2 Resin Mixing Room
3 Dosing Pump Room
4 Bridge Crane – 10 tons
5 CFW2600 Machine
6 Resin Storage 4 x 50m3
7 Vapours Suction Ventilator
8 Dust Filter
9 Pipe Transport Equipment
10 OGM2600 Offline Grinding Machine
11 SGM2600 Sleeve Grooving Machine
12 SHTM2600 Sleeve Hydrotesting Machine
13 SJM2600 Sleeve Joining Machine
14 PHTM2600/640 Pipe Hydrotesting Machine
15 Laboratory
16 Air Compressor
17 Main Power Panel
18 Main Control Console
19 Diesel Electric Generator
20 Electro Station
21 Fittings Production Area
22 Pipe Testing Area
23 Catalyst Storage Area
24 Accelerator Storage Area
Factory covered area and height required:
- Width = 36m
- Length = 78m
- Height = 7,5 (under crane hook)
Factory outside uncovered area required:
Utilities requirements:
- Power Supply = 3 x 400V / 50 Hz
- Production Line Installed Power =App. 400 kW
- Max. Compressed Air Consumption = 8 bar - 6 m3/min
- Emergency Diesel Generator = 240 kW
The complete CFW production factory requires approximately 60 employees for the production in 3 shifts (24h per day). They are divided in the following positions:
- 1 production manager
- 4 machine captains on CFW machine
- 16 machine operators on CFW machine
- 4 machine operators on the SGM machine
- 4 machine operators on the SHTM machine
- 6 machine operators on the PHTM machine
- 2 machine operators on the SJM machine
- 1 quality control manager
- 4 quality control operators
- 4 mechanical and electrical maintenance workers
- 4 store keepers
- 10 workers in the fitting manufacturing shop
|
|
Continuous filament winding
|